[マウムジギ Capstone 開発日誌 #22] 4次ファインチューニングの完成!Checkpoint-4400、黄金比率とシステム全体構成
· 約4分

The final week of May 2026 (May 27–30) proved to be the grand culmination of our experimental modeling phase. After weeks of hyperparameter tuning, GPU out-of-memory crashes, and dataset revisions, our 4th Fine-Tuning cycle (fine_tuning_4) crossed the finish line.
This post reveals the technical breakthrough that resolved the chronic "over-counseling" trap, quantitative validation of our golden weight Checkpoint-4400, and the end-to-end system architecture designed for real-world deployment.
